Current highway information

Highway 5: Coquihalla · Clearwater → Valemount winter driving conditions and weather

Official highway events, Environment Canada weather warnings and camera context for winter travel planning without inferring traction or safe travel.

Official transportation source
Road reports delayedUpdates may be delayed

2 currently effective reports; 2 upcoming; 1 with unconfirmed timing. Reported impacts use currently effective records only; selected-route coverage remains unconfirmed.

Latest retrieval attempt
Last accepted observation

Coverage of the selected route is unconfirmed.

Records were retrieved at Nov 20, 2026, 3:35 p.m. PDT. Schedule status updates locally while this page remains open.

Active reports
2
Upcoming reports
2
Timing unconfirmed
1
Completed / ended schedules
0
Cancelled reports
0

Upcoming reports

2
MinorUpcoming

Construction

Road construction from Highway 5, Cliff Rd. Starting 7:00 AM PCT on Monday November 30, 2026 until 5:00 PM PCT on Monday November 30, 2026. Single lane alternating traffic. Watch for traffic control. Last update: November 18th, 2026 at 10:57am PCT.

Highway 5 · Highway 5

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 30, 2026 to Dec 1, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 18, 2026, 10:57 a.m. PDT
MinorUpcoming

Construction

Utility work from Highway 5, 47km East of Clearwater and Skinner Rd to 30km East of Clearwater and Hoirup Rd. Starting 7:00 AM PCT on Monday November 30, 2026 until 6:00 PM PCT on Thursday December 3, 2026. From 7:00 AM to 6:00 PM PCT, Monday to Thursday. Single lane alternating traffic. Last update: November 16th, 2026 at 12:28pm PCT.

Highway 5 · Highway 5

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 30, 2026 to Dec 4, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 16, 2026, 12:28 p.m. PDT

Timing unconfirmed

1
MinorTiming unconfirmed

Road condition

Slippery sections between McMurphy Pullout; SA Boundary (18 miles south of Avola) and Blue River Bridge (near Blue River). Last update: November 20th, 2026 at 7:30am PCT. Next update: November 20th, 2026 at 4:00pm PCT.

Highway 5 · Highway 5

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 7:30 a.m. PDT

Data status

Source: DriveBC

Latest available data
Last updated

Coverage: The road status comes from information published by the transportation authority. Missing, delayed or incomplete information is not treated as an open road.

View official source →
Update details
FireRadar checked
Page prepared
Normal update timing
5 minutes

Source and FireRadar check times may differ.

Environment Canada

Weather along the corridor

Current
Alerts
0
Temperature
0°C
Wind
3 km/h
Gust
34 km/h

No active Environment Canada weather alert currently matches this corridor. Conditions can still vary locally.

Nearest weather location: Blue River · observed Nov 20, 2026, 4:00 p.m. PDT.
Tonight
Clearing early this evening. Low minus 10.
Saturday
A mix of sun and cloud. Becoming sunny near noon. High minus 1. UV index 1 or low.
Saturday night
Clear. Low minus 13.
Sunday
Sunny. High minus 4.

Winter driving

FireRadar shows road records, Environment Canada weather and cameras together. It cannot determine traction, stopping distance, chain requirements or whether travel is safe unless the transportation authority publishes that information.

View latest camera images →

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.