Current highway information

Highway 1 — British Columbia travel alerts and notifications

Current road and weather information plus FireRadar Plus Route alert options for supported conditions and notification delivery.

Official transportation source
ClosedCurrent

12 currently effective reports; 6 upcoming; 13 with unconfirmed timing. The route-wide status uses currently effective records only.

Records were retrieved at Oct 10, 2026, 12:59 a.m. PDT. Schedule status updates locally while this page remains open.

Active reports
12
Upcoming reports
6
Timing unconfirmed
13
Completed / ended schedules
0
Cancelled reports
0

Upcoming reports

6
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Road construction from Highway 1, In Abbotsford and Mt. Lehman Interchange to Highway 1A, In Abbotsford and Clearbrook Rd Interchange. Starting Tue Oct 13 until Thu Dec 31. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Lane closures in both directions. Watch for traffic control. Speed Limit restriction: 80km/hr. Last update: October 9th, 2026 at 3:24pm PDT.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Oct 14, 2026 to Dec 31, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 9, 2026, 3:24 p.m. PDT
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Utility work at Highway 1, In Revelstoke and Westside Road/Highway 23S Intersection. Starting Tue Oct 13 until Fri Oct 16. From 8:30 AM to 5:00 PM PDT, Tuesday to Friday. Single lane alternating traffic. Watch for traffic control. Expect delays. Last update: October 8th, 2026 at 9:19pm PDT. Work and traffic control begins on Tuesday October 13th at noon.

Highway 1 · Trans-Canada Highway W

Schedule: Source dates: Oct 13, 2026 to Oct 17, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 8, 2026, 9:19 p.m. PDT
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Bridge construction from Highway 1. Starting Mon Oct 19 until Mon Nov 9. Last update: October 8th, 2026 at 2:24pm PDT. Taft Overhead Bridge. Traffic speed reduced from 100kms to 50kms in construction zone. There will be a 4.0m width restriction to facilitate work at Bent 5.

Highway 1 · Crazy Creek Bridge

Schedule: Source dates: Oct 19, 2026 to Nov 9, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 8, 2026, 2:24 p.m. PDT
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Utility work from Highway 1, In Revelstoke and 10m East of Alpine Lane W to In Revelstoke and 270m East of Alpine Lane W and Trans-Canada Highway E. Starting Mon Oct 19 until Fri Oct 30. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Last update: October 3rd, 2026 at 6:41pm PDT.

Highway 1 · Trans-Canada Highway E

Schedule: Source dates: Oct 19, 2026 to Oct 30, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 3, 2026, 6:41 p.m. PDT
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Construction work from Highway 1, In Langley - District and 20m East of 216th Street to In Langley - District and 12m Northwest of 264th Street (Highway 13) Underpass. Starting Tue Oct 13 until Thu Oct 22. Last update: October 2nd, 2026 at 2:18pm PDT. Alternating eastbound and westbound lane shift. Watch for traffic control and signage.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Oct 13, 2026 to Oct 22, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 2, 2026, 2:18 p.m. PDT
CONSTRUCTIONMINORUpcoming

CONSTRUCTION

Construction work at Highway 1, In Langley - District and 232nd Street. Starting Sun Oct 18 until Mon Oct 19. Last update: October 7th, 2026 at 1:34pm PDT. Transitioning of current westbound off ramp.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Oct 19, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 7, 2026, 1:34 p.m. PDT

Timing unconfirmed

13
CONSTRUCTIONMAJORTiming unconfirmed

CONSTRUCTION

Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting Wed Aug 19. Watch for traffic control. Last update: October 7th, 2026 at 8:01am PDT. Road Closed 9AM-3PM PT Mon-Sat. No closure from 12PM Fri Oct 9 - 12PM Tues Oct 13. Alternate routes Highway 97A and 97B. Single lane alternating traffic Mon-Sat 8PM-6AM. Local access to Old Sicamous Rd/Old Spallumcheen Rd at top of hour during closure. No thru-traffic.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Aug 19, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 7, 2026, 8:01 a.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Construction work from Highway 1, At W/B Exit to Illecillewaet Brake Check / Rest Area to At Jack Macdonald Snowshed. Starting Tue Jul 14 until Tue Oct 13. All day, every day. Speed Limit restriction: 80. Last update: October 9th, 2026 at 2:25pm PDT. Construction zone. Reduced speed. Drive with caution.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Jul 14, 2026 to Oct 13, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 9, 2026, 2:25 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Utility work from Highway 1, 52km West of Kamloops and At Deadman-Vidette Road to At Pinecrest Drive. Starting Mon Oct 7 until Fri Oct 16. From 8:00 AM to 4:00 PM LMT, every day. Single lane alternating traffic. Last update: October 7th, 2026 at 10:33am PDT.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Oct 7, 1016 to Oct 16, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 7, 2026, 10:33 a.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Paving operations from Highway 1, In Hope and Exit 171: Old Hope-Princeton Highway to Exit 146. Starting Mon Aug 31 until Sat Oct 31. From 6:00 AM to 6:00 PM PDT, Monday to Saturday. Watch for traffic control. Last update: September 29th, 2026 at 12:13pm PDT. Watch for crews and equipment working. Speeds reduced to 60km/h through work zones. Detours will be in effect for off and on-ramp closures when night work takes place.

Highway 1 · Water Avenue Onramp

Schedule: Source dates: Aug 31, 2026 to Nov 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 29, 2026, 12:13 p.m. PDT
CONSTRUCTIONMAJORTiming unconfirmed

CONSTRUCTION

Paving operations from Highway 1, In Abbotsford and Vedder Canal Bridge to In Abbotsford and Sumas Way. Starting Sun Sep 13 until Tue Oct 20. From 7:00 PM to 6:00 AM PDT the next day, weekdays and Sunday. Reduced to one lane. Last update: September 29th, 2026 at 12:11pm PDT. All on and off ramps will also be paved during this time. Motorists are advised to obey all posted speed limits, traffic signs, and traffic control personnel.

Highway 1 · Vedder River Bridge

Schedule: Source dates: Sep 14, 2026 to Oct 20, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 29, 2026, 12:11 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Utility work from Highway 1, 449m Southeast of China Bar Tunnel to 273m Northeast of China Bar Tunnel. Starting Thu Sep 17 until Sun Jan 31. From 8:00 AM to 6:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: September 16th, 2026 at 4:56pm PDT. Vegetation removal.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Sep 17, 2026 to Feb 1, 2027 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 16, 2026, 4:56 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Utility work from Highway 1, 11km South of Cache Creek to 12km South of Cache Creek. Starting Mon Apr 27. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 15th, 2026 at 8:09pm PDT.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Apr 27, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 8:09 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Road maintenance from Highway 1, At Bench Snowshed. Starting Tue Sep 8 until Fri Oct 30. All day, every day. Last update: September 15th, 2026 at 8:06pm PDT. Snowshed maintenance. Intermittent short term stoppages. Speeds reduced to 30 km/hr. Lane width reduced to 3.2m. Watch for traffic control and expect delays. Please reach out to Online Constructors at 604-791-8264 to coordinate wide load passage.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Sep 8, 2026 to Oct 31, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 8:06 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Utility work from Highway 1, In Sicamous and At Old Sicamous Road to In Salmon Arm and 850m Northeast of Canoe Beach Drive NE. Starting Thu Sep 17 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Last update: September 15th, 2026 at 3:03pm PDT. BC Hydro pole replacement.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Sep 17, 2026 to Dec 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 3:03 p.m. PDT
CONSTRUCTIONMAJORTiming unconfirmed

CONSTRUCTION

Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Jan 30, 2026 to Dec 16, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Jun 24, 2026, 9:31 p.m. PDT
ROAD_CONDITIONMINORTiming unconfirmed

ROAD_CONDITION

Water pooling between Back Valley Road (8 miles east of Cache Creek) and Comazzetto Road (near Kamloops). Last update: October 9th, 2026 at 5:57pm PDT. Next update: October 10th, 2026 at 5:00am PDT.

Highway 1 · Highway 1

Schedule: Source dates: Oct 10, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 9, 2026, 5:57 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Construction work from Highway 1, Ford Rd to Bolton Rd. Starting Mon Sep 14 until Sat Oct 31. From 7:00 AM to 5:00 PM PDT, Monday to Saturday. Last update: September 15th, 2026 at 3:03pm PDT. Watch for crews and equipment. Expect minor delays. Localized speed reductions, lane drops and Intermittent minor stoppages possible.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Sep 14, 2026 to Nov 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 3:03 p.m. PDT
CONSTRUCTIONMINORTiming unconfirmed

CONSTRUCTION

Mowing. Starting Mon Jun 29. From 7:00 AM to 3:00 PM PST on Monday, Tuesday, Wednesday, and Thursday. Watch for traffic control. Slow moving vehicle - shoulder mowing in progress. Watch for traffic control from Boston Bar northbound to Jackass Summit.

Highway 1 · Trans-Canada Highway

Schedule: Source dates: Jun 29, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Jun 29, 2026, 8:30 a.m. PDT

Data status

Source: DriveBC

Current
Last updated

Coverage: The road status comes from information published by the transportation authority. Missing, delayed or incomplete information is not treated as an open road.

View official source →
Update details
FireRadar checked
Page prepared
Normal update timing
5 minutes

Source and FireRadar check times may differ.

Environment Canada

Weather along the corridor

Current
Alerts
0
Temperature
8°C
Wind
3 km/h
Gust
42 km/h

No active Environment Canada weather alert currently matches this corridor. Conditions can still vary locally.

Nearest weather location: Salmon Arm · observed Oct 10, 2026, 1:00 a.m. PDT.
Tonight
Rain ending near midnight then cloudy with 60 percent chance of showers. Amount 5 to 10 mm. Wind west 20 km/h gusting to 40 becoming light this evening. Low 8.
Saturday
A mix of sun and cloud. 30 percent chance of showers early in the morning. Wind becoming north 20 km/h in the morning. High 14. UV index 2 or low.
Saturday night
Partly cloudy. Becoming clear in the evening. Wind north 20 km/h becoming light near midnight. Low plus 1.
Sunday
Sunny. High 12.
FireRadar Plus

Get route alerts

Route alerts are included with FireRadar Plus. Choose supported closure, reopening, restriction, severe-weather and nearby-wildfire conditions, with email and eligible SMS or browser notification delivery where supported. Current highway information remains free.

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.