Wildfires along this route

Highway 1: British Columbia

Official wildfire activity and nearby safety information along this route, with DriveBC road reports and cameras further down.

Check DriveBC official road information →
Wildfire activity

Wildfires near this route

Updates delayed

2 active wildfires reported within 5 km of this route.

  • Nearest reported fire: Brunswick Creek, 0.6 km from the route, under control.
  • Wildfire agency updates are delayed, so recent changes may not be shown yet.
Open Brunswick Creek →
Within 5 km
2
Within 25 km
2
Within 50 km
3
Out of control · 25 km
0

Fires within 50 km, closest first

  1. Brunswick Creek

    Under control · 9,543 ha · 0.6 km from the route · near Hope → Kamloops

    Agency update: Nov 12, 2026, 1:44 p.m. PDT

  2. Ainslie Creek

    Under control · 69,705 ha · 0.9 km from the route · near Hope → Kamloops

    Agency update: Nov 12, 2026, 1:52 p.m. PDT

  3. Pear Lake

    Under control · 165,909 ha · 39 km from the route · near Hope → Kamloops

    Agency update: Sep 21, 2026, 7:46 a.m. PDT

FireRadar checked Nov 20, 2026, 4:40 p.m. PDT. Source: BC Wildfire Service. Fires across a provincial or territorial border are not included.

Distances are measured to a representative corridor line. They do not predict fire spread or determine whether the road is safe or open.

Route map & wildfire context

View official wildfires around this highway. Smoke and AQHI layers each have their own source. The map does not determine whether the highway is safe to travel.

FireRadarLoading wildfire map
  • Orange line: selected highway scope
  • Out of control / not under control
  • Being held / monitored
  • Under control
  • The orange line follows sourced road segments. Section boundaries may be approximate and gaps stay disconnected.
  • Open a wildfire marker for the agency's full status.
Road geometry sources and licences
Near this route

Evacuations, fire bans and smoke

Evacuation notices

Official evacuation notices near this route

Current orders, alerts and notices whose mapped area is within 10 km of the route, from the sources FireRadar monitors.

Checking official evacuation notices…

All evacuation notices in Canada →
Fire bans and restrictions

Fire restrictions along Highway 1: British Columbia

Open restriction map →
Checking current restrictions… No result is shown until the source check is complete.
Smoke and air quality

Smoke and air quality along this route

ECCC FireWork smoke forecast and the nearest measured AQHI at 3 places along the route.

Official road authority

Road and travel information

Road status, reports and cameras come from DriveBC. They are kept separate from the wildfire information above; check the road authority before you travel.

Official road report
12 active road reportsCurrent

DriveBC has not provided enough currently effective impact information to confirm travel conditions. Upcoming or unclear schedules are shown separately; missing information does not mean the road is open.

Latest retrieval attempt
Last accepted observation

Coverage of the selected route is unconfirmed.

Active reports
12
Upcoming reports
12

Road reports and scheduled work

Active reports

12
MajorActive

Construction

Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: May 7, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Jul 16, 2026, 11:20 p.m. PDT
MinorActive

Road condition

Slippery sections between Glacier Park East Boundary and Quartz Creek Bridge (Structure) (14 miles east of East Boundary of Glacier National Park). Last update: November 20th, 2026 at 4:23pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 1 · Highway 1 · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 4:23 p.m. PDT
MinorActive

Road condition

Slippery sections between Rogers Pass Summit (Rogers Pass Summit) and Glacier Park East Boundary (East Boundary of Glacier National Park). Last update: November 20th, 2026 at 4:23pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 1 · Highway 1 · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 4:23 p.m. PDT
MinorActive

Road condition

Slippery sections between Glacier National Park West Boundary (near West Boundary of Glacier National Park) and Glacier National Park Summit (Rogers Pass Summit). Last update: November 20th, 2026 at 4:23pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 1 · Highway 1 · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 4:23 p.m. PDT
MinorActive

Construction

Construction work from Highway 1, At Quartz Creek Bridge to Wiseman Road. Starting 9:00 AM MDT on Monday April 20, 2026 until 2:00 PM MDT on Sunday December 20, 2026. Expect delays. Watch for traffic control. Width restriction: 5 meters. Last update: November 19th, 2026 at 2:12pm MDT.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Apr 20, 2026 to Dec 20, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 19, 2026, 1:12 p.m. PDT
MinorActive

Construction

Bridge construction at Highway 1, Taft Overhead Bridge. Starting 12:00 AM PCT on Monday November 16, 2026 until 12:00 AM PCT on Thursday December 10, 2026. Single lane alternating traffic. Watch for traffic control. Last update: November 13th, 2026 at 5:02am PCT. Speed reduced to 50 km/h in construction zone. Single lane alternating traffic in effect 24/7. There's a 4.0m width restriction to facilitate work at Bent 5.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 16, 2026 to Dec 10, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 13, 2026, 5:02 a.m. PDT
MinorActive

Construction

Construction work at Highway 1, Gladwin Rd. and 8km East of Lytton. Starting 12:00 PM PST on Saturday November 15, 2025 until 11:45 PM PCT on Wednesday November 25, 2026. Expect 5 minutes delay. Watch for traffic control. Last update: November 3rd, 2026 at 9:23am PCT. Gladwin Culvert Replacement.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 15, 2025 to Nov 26, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 3, 2026, 9:23 a.m. PDT
MinorActive

Construction

Construction work from Highway 1, In Revelstoke and Highway 23 South to In Revelstoke and Victoria Rd. Starting 8:00 AM PDT on Monday October 26, 2026 until 4:00 PM MST on Monday November 30, 2026. Last update: October 26th, 2026 at 9:46pm PDT. Paving Oct 26 to Nov 8. Single lane alternating traffic. Expect 20 minute delays. Columbia Rest Area closed until Nov 30. Use alternate rest area.

Highway 1 · Trans-Canada Highway W · Reported source state: All Lanes Open

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Oct 26, 2026 to Nov 30, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 26, 2026, 9:46 p.m. PDT
MinorActive

Construction

Construction work at Highway 1, Glacier National Park and At Beaver Valley Picnic Site. Starting 7:00 AM PDT on Monday October 26, 2026 until 11:59 PM MST on Friday December 11, 2026. Expect delay of 20 minutes. Last update: October 22nd, 2026 at 2:46pm PDT. Speed reduced to 50km/h. Expect intermittent holds to traffic.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Oct 26, 2026 to Dec 12, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Oct 22, 2026, 2:46 p.m. PDT
MinorActive

Construction

Rest area closed at Highway 1, Redgrave Rest Area. Starting Tue Jul 14. Last update: September 15th, 2026 at 9:06pm MDT. Redgrave rest area is permanently closed. New rest area will be built just west of the current location. Stay tuned for more updates as construction progresses.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Jul 14, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

Official update: Sep 15, 2026, 8:06 p.m. PDT
MinorActive

Construction

Construction work from Highway 1, Nicomen River Rd to At Exit From Highway 1 Northbound to Highway 8. Starting Tue Aug 25 until Wed Jun 30. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Last update: August 25th, 2026 at 2:02pm PDT.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Ramp or exit impact reported · Reported direction: BOTH

Schedule: Source dates: Aug 25, 2026 to Jun 30, 2027 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Aug 25, 2026, 2:02 p.m. PDT
MinorActive

Construction

Road construction from Highway 1, In Langley - District and 23m Southeast of 216 Street Underpass to In Langley - District and At 232 Street Underpass. Starting Sun Aug 23 until Tue Dec 15. Last update: August 21st, 2026 at 9:41am PDT. Eastbound lane shift. Watch for crews and signage.

Highway 1 · Trans-Canada Highway · Reported source state: All Lanes Open

Lane impact reported · Reported direction: E

Schedule: Source dates: Aug 23, 2026 to Dec 15, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Aug 21, 2026, 9:41 a.m. PDT

Upcoming reports

12
MinorUpcoming

Construction

Tree pruning from Highway 1, Cypress Bowl Road to In West Vancouver and Westmount Road. Starting 10:00 PM PCT on Wednesday November 25, 2026 until 5:00 AM PCT on Friday November 27, 2026. From 10:00 PM to 5:00 AM PCT the next day, Wednesday and Thursday. Left lane closed. Last update: November 20th, 2026 at 1:52pm PCT. Crews will be working in the center median in both directions to remove trees.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 26, 2026 to Nov 27, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 1:52 p.m. PDT
MinorUpcoming

Construction

Tree pruning from Highway 1, Westmount Road to Cypress Bowl Rd. Starting 10:00 PM PCT on Wednesday November 25, 2026 until 5:00 AM PCT on Friday November 27, 2026. From 10:00 PM to 5:00 AM PCT the next day, Wednesday and Thursday. Left lane closed. Last update: November 20th, 2026 at 1:50pm PCT. Crews will be working in the center median in both directions to remove trees.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 26, 2026 to Nov 27, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 1:50 p.m. PDT
MinorUpcoming

Construction

Tree pruning from Highway 1, In North Vancouver - City to In North Vancouver - City. Starting 10:00 PM PCT on Monday November 23, 2026 until 5:00 AM PCT on Wednesday November 25, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday and Tuesday. Last update: November 20th, 2026 at 1:47pm PCT. Crews will be working in the center median in both directions to remove trees.

Highway 1 · Trans-Canada Highway

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 24, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 1:47 p.m. PDT
MinorUpcoming

Construction

Tree pruning from Highway 1, In North Vancouver - City to In North Vancouver - District. Starting 10:00 PM PCT on Monday November 23, 2026 until 5:00 AM PCT on Wednesday November 25, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday and Tuesday. Left lane closed. Last update: November 20th, 2026 at 1:45pm PCT. Crews will be working in the center median in both directions to remove trees.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 24, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 1:45 p.m. PDT
MinorUpcoming

Construction

Tree pruning from Highway 1, In North Vancouver - District to Westview Drive Offramp, In North Vancouver - City. Starting 10:00 PM PCT on Monday November 23, 2026 until 5:00 AM PCT on Wednesday November 25, 2026. From 10:00 PM to 5:00 AM PCT the next day, Monday and Tuesday. Right lane closed. Last update: November 20th, 2026 at 1:43pm PCT. Crews will be working all the Westview on/off ramps and Mosquito Creek Bridge to remove trees.

Highway 1 · Trans-Canada Highway

Ramp or exit impact reported · Reported direction: W

Schedule: Source dates: Nov 24, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 1:43 p.m. PDT
MinorUpcoming

Construction

Road maintenance at Highway 1, In Vancouver. Starting 8:00 PM PCT on Monday December 7, 2026 until 12:00 AM PCT on Tuesday December 8, 2026. Left lane closed. Last update: November 20th, 2026 at 11:08am PCT.

Highway 1 · Cassiar Tunnel

Lane impact reported · Reported direction: W

Schedule: Source dates: Dec 8, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 11:08 a.m. PDT
MinorUpcoming

Construction

Electrical maintenance from Highway 1, 300m Southeast of Kahmoose Road to 428m South of Ainslie Road N. Starting 9:00 AM PCT on Wednesday December 16, 2026 until 4:00 PM PCT on Wednesday December 16, 2026. From 9:00 AM to 4:00 PM PCT, Wednesday. Single lane alternating traffic. Watch for traffic control. Last update: November 19th, 2026 at 3:18pm PCT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: N

Schedule: Source dates: Dec 16, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 19, 2026, 3:18 p.m. PDT
MinorUpcoming

Construction

Electrical maintenance from Highway 1, Pfenniger Road to At Ainslie Road N. Starting 9:00 AM PCT on Monday December 21, 2026 until 4:00 PM PCT on Monday December 21, 2026. From 9:00 AM to 4:00 PM PCT, Monday. Single lane alternating traffic. Watch for traffic control. Last update: November 19th, 2026 at 3:05pm PCT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: N

Schedule: Source dates: Dec 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 19, 2026, 3:05 p.m. PDT
MinorUpcoming

Construction

Electrical maintenance from Highway 1, At Pfenniger Road to At 70 Kilometre Post. Starting 9:00 AM PCT on Monday December 21, 2026 until 4:00 PM PCT on Monday December 21, 2026. From 9:00 AM to 4:00 PM PCT, Monday. Single lane alternating traffic. Watch for traffic control. Last update: November 19th, 2026 at 3:04pm PCT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: N

Schedule: Source dates: Dec 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 19, 2026, 3:04 p.m. PDT
MinorUpcoming

Construction

Electrical maintenance at Highway 1. Starting 7:00 AM PCT on Wednesday November 25, 2026 until 5:00 PM PCT on Friday November 27, 2026. Lane closures in both directions. Expect minor delays. Last update: November 17th, 2026 at 11:22am PCT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 25, 2026 to Nov 28, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 17, 2026, 11:22 a.m. PDT
MinorUpcoming

Construction

Road construction from Highway 1, Highland Road to Tanager Drive. Starting 9:00 AM PCT on Monday November 23, 2026 until 4:00 PM PCT on Wednesday November 25, 2026. From 9:00 AM to 4:00 PM PCT, Monday to Wednesday. Right turn lane closed. Watch for traffic control. Last update: November 17th, 2026 at 9:37am PCT.

Highway 1 · Trans-Canada Highway E

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 23, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 17, 2026, 9:37 a.m. PDT
MinorUpcoming

Construction

Utility work from Highway 1, Boston Bar Airstrip to C¿¿X¿¿ ¿¿ Cix¿¿ Bridge. Starting 8:00 AM PCT on Tuesday November 24, 2026 until 5:00 PM PCT on Tuesday November 24, 2026. From 8:00 AM to 5:00 PM PCT, Tuesday. Watch for traffic control. Last update: November 13th, 2026 at 9:37am PCT. Crews will be working along the shoulder installing hydro poles.

Highway 1 · Trans-Canada Highway

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 24, 2026 to Nov 25, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 13, 2026, 9:37 a.m. PDT

Timing unconfirmed

13
MajorTiming unconfirmed

Construction

Road construction from Highway 1, In Langley - District and 256th Street to In Abbotsford and Lefeuvre Road. Starting 12:00 AM PDT on Friday October 30, 2026 until 12:00 AM PCT on Thursday December 31, 2026. All day, every day. Closed. Detour in effect. Watch for traffic control. Expect delays. Last update: October 31st, 2026 at 2:02pm PDT. Eastbound traffic will be shifted to south of the median.

Highway 1 · Trans-Canada Highway · Source-reported impact (timing unconfirmed): Closed

Directional impact reported · Reported direction: E

Schedule: Source dates: Oct 30, 2026 to Dec 31, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 31, 2026, 2:02 p.m. PDT
MajorTiming unconfirmed

Construction

Construction work from Highway 1, In Sicamous and Old Sicamous Road to In Sicamous and Solsqua-Sicamous Road. Starting 9:00 AM PDT on Wednesday August 19, 2026. Watch for traffic control. Last update: November 18th, 2026 at 10:22am PCT. Road Closed 9AM-3PM PT Mon-Fri. Alternate routes Highway 97A and 97B. Local access to Old Sicamous Rd/Old Spallumcheen Rd at top of hour during closure. No thru-traffic.

Highway 1 · Trans-Canada Highway

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Aug 19, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 18, 2026, 10:22 a.m. PDT
MajorTiming unconfirmed

Construction

Construction work. Starting Thu Jan 29 until Tue Dec 15. From 9:00 PM to 5:30 AM PST on Monday, Tuesday, Wednesday, Thursday, and Friday. From 9:00 PM to 7:30 AM PST on Saturday and Sunday. Speed Limit restriction: 60km/hr. Single lane traffic in both directions.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Jan 30, 2026 to Dec 16, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Jun 24, 2026, 9:31 p.m. PDT
MinorTiming unconfirmed

Road condition

Compact ice and Slippery sections between Emerald Lake Road and BC/Alberta Border (Field). Last update: November 20th, 2026 at 5:23pm MDT. Next update: November 21st, 2026 at 6:00am MDT.

Highway 1 · Highway 1

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 4:23 p.m. PDT
MinorTiming unconfirmed

Road condition

Compact ice and Slippery sections between Beaverfoot Road (near West Boundary of Yoho National Park) and Field and Visitor Centre Access Road (near Field). Last update: November 20th, 2026 at 5:23pm MDT. Next update: November 21st, 2026 at 6:00am MDT.

Highway 1 · Highway 1

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 4:23 p.m. PDT
MinorTiming unconfirmed

Incident

Vehicle recovery at Highway 1, 34km East of Golden and Hoodoo Creek. Expect delays. Watch for traffic control. Last update: November 20th, 2026 at 4:56pm MDT. Next update: November 20th, 2026 at 7:15pm MDT.

Highway 1 · Trans-Canada Highway

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:56 p.m. PDT
MinorTiming unconfirmed

Construction

Ditch maintenance from Highway 1, Thomas Road to Anderson Mainline Road. Starting 8:00 AM PCT on Wednesday November 18, 2026 until 4:22 PM PCT on Thursday November 26, 2026. All day, Monday to Thursday. Single lane alternating traffic. Last update: November 18th, 2026 at 12:22pm PCT. Single lane alternating traffic. Watch for crews working.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 18, 2026 to Nov 26, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 18, 2026, 12:22 p.m. PDT
MinorTiming unconfirmed

Construction

Utility work from Highway 1, Chapmans Bar 10 to 1st Avenue. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Monday November 30, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Expect delays. Last update: November 13th, 2026 at 10:12am PCT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 16, 2026 to Nov 30, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 13, 2026, 10:12 a.m. PDT
MinorTiming unconfirmed

Construction

Road construction from Highway 1, In Abbotsford and Mt. Lehman Interchange to Highway 1A, In Abbotsford and Clearbrook Rd Interchange. Starting Tue Oct 13 until Thu Dec 31. From 9:00 PM to 5:00 AM PDT the next day, Monday to Saturday. Lane closures in both directions. Watch for traffic control. Speed Limit restriction: 80km/hr. Last update: October 9th, 2026 at 3:24pm PDT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Oct 14, 2026 to Dec 31, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 9, 2026, 3:24 p.m. PDT
MinorTiming unconfirmed

Construction

Utility work from Highway 1, 449m Southeast of China Bar Tunnel to 273m Northeast of China Bar Tunnel. Starting Thu Sep 17 until Sun Jan 31. From 8:00 AM to 6:00 PM PDT, every day. Single lane alternating traffic. Watch for traffic control. Last update: September 16th, 2026 at 4:56pm PDT. Vegetation removal.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Sep 17, 2026 to Feb 1, 2027 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 16, 2026, 4:56 p.m. PDT
MinorTiming unconfirmed

Construction

Utility work from Highway 1, 11km South of Cache Creek to 12km South of Cache Creek. Starting Mon Apr 27. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: September 15th, 2026 at 8:09pm PDT.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Apr 27, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 8:09 p.m. PDT
MinorTiming unconfirmed

Construction

Utility work from Highway 1, In Sicamous and At Old Sicamous Road to In Salmon Arm and 850m Northeast of Canoe Beach Drive NE. Starting Thu Sep 17 until Mon Nov 30. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Last update: September 15th, 2026 at 3:03pm PDT. BC Hydro pole replacement.

Highway 1 · Trans-Canada Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Sep 17, 2026 to Dec 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Sep 15, 2026, 3:03 p.m. PDT
MinorTiming unconfirmed

Construction

Mowing. Starting Mon Jun 29. From 7:00 AM to 3:00 PM PST on Monday, Tuesday, Wednesday, and Thursday. Watch for traffic control. Slow moving vehicle - shoulder mowing in progress. Watch for traffic control from Boston Bar northbound to Jackass Summit.

Highway 1 · Trans-Canada Highway

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Jun 29, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Jun 29, 2026, 8:30 a.m. PDT

Data status

Source: DriveBC

Latest available data
Last updated

Coverage: Current road events and latest camera images come from DriveBC.

View official source →
Update details
FireRadar checked
Page prepared
Normal update timing
5 minutes

Source and FireRadar check times may differ.

Official highway cameras

Images update periodically. They are not live video or proof that a road is open or safe, and FireRadar does not keep a camera archive.

Environment Canada

Weather along this route

Current

Environment Canada weather is shown separately from the road status. Always check the transportation authority before travel.

Alerts
0
Temperature
3°C
Wind
Not reported
Humidity
77%

No Environment Canada weather alert currently overlaps this corridor area. This does not guarantee safe road conditions.

Nearest available weather station: Salmon Arm · approximately 17 km from the route reference point · observed Nov 20, 2026, 4:00 p.m. PDT
Tonight
Partly cloudy. Low minus 3.
Saturday
Mainly cloudy. Clearing near noon. High plus 2. UV index 1 or low.
Saturday night
Clear. Becoming partly cloudy overnight. Low minus 4.
Sunday
Cloudy with 70 percent chance of flurries. High minus 1.
Verify Environment Canada weather →
Highway information

Road conditions and more

Focused views of road conditions, closures, cameras, weather, nearby wildfires and travel alerts for this highway. Official road status is kept separate from wildfire and weather information.

Highway sections

Each section has its own wildfire summary, map, nearby notices and road information.

About this information
Wildfire impact

Nearby wildfire conditions

Wildfire counts and distances use the latest official records from BC Wildfire Service. They are context only, not a fire-spread forecast or travel-safety score.

Check fire bans and restrictions →
Weather

Official alerts and forecasts

Check Environment Canada warnings and DriveBC before travel. If official visibility, snowfall or road-surface information is missing, FireRadar leaves it unavailable.

Environment Canada warnings →
Updates

Each source has its own timestamp

Wildfire records, road reports and cameras update on different schedules. Each timestamp is shown with its source. Missing information remains unavailable and is never shown as zero.

FireRadar methodology →