Current highway information

Route 117: Montréal to Val-d'Or road conditions and official status

Current road conditions and restrictions from the responsible road authority, with the latest available update time.

Official transportation source
Road report timing unconfirmedCurrent

0 currently effective reports; 2 upcoming; 4 with unconfirmed timing. Reported impacts use currently effective records only; selected-route coverage remains unconfirmed.

Latest retrieval attempt
Last accepted observation

Coverage of the selected route is unconfirmed.

Excluded source records: 360 for other roads; 0 without usable coordinates.

Records were retrieved at Nov 20, 2026, 4:46 p.m. PDT. Schedule status updates locally while this page remains open.

Active reports
0
Upcoming reports
2
Timing unconfirmed
4
Completed / ended schedules
0
Cancelled reports
0

Road records

Closures and restrictions appear before lower-impact maintenance records. Missing or delayed records are not confirmation that the road is open.

Upcoming reports

2
ConstructionSeverity not suppliedUpcoming

Equipment installation

Equipment installation In Rosemère, at the level of Thorncliffe Street In both directions Closure of 1 out of 2 lanes Installation d'équipement À Rosemère, à la hauteur de la rue Thorncliffe Dans les deux directions Fermeture de 1 voie sur 2

Route 117 · Scheduled source impact: Roadwork Reported

Lane impact reported · Reported direction: Both directions

Schedule: Nov 23, 2026, 7:00 a.m. EST to Nov 23, 2026, 12:00 p.m. EST

Official update: Nov 20, 2026, 3:14 p.m. PDT
ConstructionSeverity not suppliedUpcoming

Fiber optic installation

Fiber optic installation In Rivière-Rouge, at the level of the De la Ferme Road Alternating traffic, Monday to Wednesday between 6 a.m. and 6 p.m Installation fibre optique À Rivière-Rouge, à la hauteur du chemin de la Ferme Circulation en alternance, lundi au mercredi entre 6 h et 18 h

Route 117 · Scheduled source impact: Roadwork Reported

Lane impact reported · Reported direction: Both directions

Schedule: Nov 23, 2026, 6:00 a.m. EST to Nov 25, 2026, 6:00 p.m. EST

Official update: Nov 20, 2026, 12:42 p.m. PDT

Timing unconfirmed

4
ConstructionSeverity not suppliedTiming unconfirmed

Public services, aqueduct

Public services, aqueduct In Rosemère, SOUTH of Highway 640 In both directions Closure of 1 out of 2 lanes at all times Services publics, aqueduc À Rosemère, au SUD de l'A-640 Dans les deux directions Fermeture de 1 voie sur 2, en tout temps

Route 117 · Source-reported impact (timing unconfirmed): Roadwork Reported

Lane impact reported · Reported direction: Both directions

Schedule: Oct 4, 2026, 10:30 p.m. EDT to Nov 28, 2026, 5:00 a.m. EST; work periods unconfirmed · Work periods are unconfirmed

Québec 511 / MTMD reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 19, 2026, 7:43 a.m. PDT
ConstructionSeverity not suppliedTiming unconfirmed

Road repairs

Road repairs In Sainte-Adèle, at the level of Pilon Street SOUTHBOUND Right lane narrows Pilon Street closed between Archambault Street and Route 117 Detour Henri-Dunant Street Réparation de la chaussée À Sainte-Adèle, à la hauteur de la rue Pilon En direction SUD Voie de droite rétrécie Rue Pilon fermée entre rue Archambault et R-117 Détour Rue Henri-Dunant

Route 117 · Source-reported impact (timing unconfirmed): Roadwork Reported

Lane impact reported · Reported direction: Southbound

Schedule: Nov 12, 2026, 6:00 a.m. EST to Nov 27, 2026, 5:00 p.m. EST; work periods unconfirmed · Work periods are unconfirmed

Québec 511 / MTMD reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 13, 2026, 12:29 p.m. PDT
ConstructionSeverity not suppliedTiming unconfirmed

Structural repair

Structural repair In Sainte-Adèle, near the Mont-Sauvage Road, on the bridge over the Rivière aux Mulets Alternating traffic, at all times Available lane width: 3.5 meters Réparation de structure À Sainte-Adèle, à la hauteur du chemin du Mont-Sauvage, sur le pont de la rivière aux Mulets Circulation en alternance, en tout temps Largeur de la voie disponible : 3,5 mètres

Route 117 · Source-reported impact (timing unconfirmed): Roadwork Reported

Lane impact reported · Reported direction: Both directions

Schedule: Oct 12, 2026, 11:59 p.m. EDT to Dec 13, 2026, 11:59 p.m. EST; work periods unconfirmed · Work periods are unconfirmed

Québec 511 / MTMD reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Oct 16, 2026, 9:04 a.m. PDT
ConstructionSeverity not suppliedTiming unconfirmed

Construction of a street, access to the construction site

Construction of a street, access to the construction site In Prévost, between Maple and Richer Streets SOUTHBOUND Closure of 1 out of 2 lanes at all times Construction d'une rue, accès au chantier À Prévost, entre les rues Maple et Richer En direction SUD Fermeture de 1 voie sur 2, en tout temps

Route 117 · Source-reported impact (timing unconfirmed): Roadwork Reported

Lane impact reported · Reported direction: Southbound

Schedule: Jun 17, 2026, 7:00 a.m. EDT to Dec 31, 2026, 11:59 p.m. EST; work periods unconfirmed · Work periods are unconfirmed

Québec 511 / MTMD reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Jun 18, 2026, 8:24 a.m. PDT

Data status

Source: Québec 511 / MTMD

Latest available data
Last updated

Coverage: The road status comes from information published by the transportation authority. Missing, delayed or incomplete information is not treated as an open road.

View official source →
Update details
FireRadar checked
Page prepared
Normal update timing
10 minutes on demand

Source and FireRadar check times may differ.

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.