Current highway information

Highway 97: Okanagan & Cariboo winter driving conditions and weather

Official highway events, Environment Canada weather warnings and camera context for winter travel planning without inferring traction or safe travel.

Official transportation source
Section reported openCurrent

7 currently effective reports; 6 upcoming; 20 with unconfirmed timing. Reported impacts use currently effective records only; selected-route coverage remains unconfirmed.

Latest retrieval attempt
Last accepted observation

Coverage of the selected route is unconfirmed.

Records were retrieved at Nov 20, 2026, 4:40 p.m. PDT. Schedule status updates locally while this page remains open.

Active reports
7
Upcoming reports
6
Timing unconfirmed
20
Completed / ended schedules
0
Cancelled reports
0

Upcoming reports

6
MinorUpcoming

Construction

Ditch maintenance from Highway 97. Starting 8:00 AM MST on Monday November 23, 2026 until 11:00 AM MST on Monday November 23, 2026. Single lane alternating traffic. Last update: November 20th, 2026 at 8:09am MST. Expect possible delays. Please obey all traffic control personnel and signage, reduce your speed, and proceed with caution through the work zone.

Highway 97 · Highway 97

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 23, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 20, 2026, 8:09 a.m. PDT
MinorUpcoming

Construction

Road maintenance from Highway 97. Starting 8:00 AM PCT on Monday November 23, 2026 until 5:00 PM PCT on Friday November 27, 2026. From 8:00 AM to 5:00 PM PCT, weekdays. Southbound lane closure. Watch for traffic control. Last update: November 18th, 2026 at 8:25am PCT. Road maintenance in progress. Use caution when passing crew and equipment working.

Highway 97 · Highway 97

Lane impact reported · Reported direction: S

Schedule: Source dates: Nov 23, 2026 to Nov 28, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 18, 2026, 8:25 a.m. PDT
MinorUpcoming

Construction

Construction work at Highway 97, 1km Southeast of Crooked River Rest Area S Access. Starting 8:00 AM PCT on Thursday December 3, 2026 until 5:00 PM PCT on Wednesday December 9, 2026. From 8:00 AM to 5:00 PM PCT, every day. Last update: November 17th, 2026 at 4:30pm PCT. Possible lane closure. Watch for industrial traffic.

Highway 97 · Hart Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Dec 3, 2026 to Dec 10, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 17, 2026, 4:30 p.m. PDT
MinorUpcoming

Construction

Utility work at Highway 97, 1km North of Hodda Lake FSR. Starting 7:00 AM PCT on Monday November 23, 2026 until 6:00 PM PCT on Friday December 4, 2026. From 7:00 AM to 6:00 PM PCT, weekdays. Reduced to one lane. Last update: November 16th, 2026 at 10:25am PCT.

Highway 97 · Hart Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 23, 2026 to Dec 5, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 16, 2026, 10:25 a.m. PDT
MinorUpcoming

Construction

Utility work from Highway 97, 19km South of 100 Mile House to 23km South of 100 Mile House. Starting 8:00 AM PCT on Tuesday December 1, 2026 until 4:00 PM PCT on Wednesday December 30, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Watch for traffic control. Last update: November 4th, 2026 at 11:34am PCT. Work on shoulder.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Dec 1, 2026 to Dec 30, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 4, 2026, 11:34 a.m. PDT
MinorUpcoming

Construction

Utility work from Highway 97, 6km North of 100 Mile House to 2km North of 100 Mile House. Starting 8:00 AM PCT on Tuesday December 1, 2026 until 4:00 PM PCT on Wednesday December 30, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Last update: November 4th, 2026 at 8:50am PCT.

Highway 97 · Highway 97

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Dec 1, 2026 to Dec 30, 2026 (exact timing unconfirmed) · Exact local time was not supplied

Official update: Nov 4, 2026, 8:50 a.m. PDT

Timing unconfirmed

20
MinorTiming unconfirmed

Road condition

Slippery sections between Tudyah Lake Provincial Pk (1 mile south of Mackenzie Junction) and Old Hasler Road (near Pine Pass Summit). Last update: November 20th, 2026 at 3:56pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:56 p.m. PDT
MinorTiming unconfirmed

Road condition

Snowing and Slippery sections between Carp Lake Road (McLeod Lake) and Kloss Road (1 mile south of Mackenzie Junction). Last update: November 20th, 2026 at 3:45pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:45 p.m. PDT
MinorTiming unconfirmed

Road condition

Slippery sections between Grizzly Avenue (57 miles north of Prince George) and Carp Lake Road (McLeod Lake). Last update: November 20th, 2026 at 3:45pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:45 p.m. PDT
MinorTiming unconfirmed

Road condition

Slippery sections between Mitchell Road and Grizzly Avenue (22 to 57 miles north of Prince George). Last update: November 20th, 2026 at 3:45pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:45 p.m. PDT
MinorTiming unconfirmed

Road condition

Slippery sections between Stoner Pit Road (22 miles south of Pineview) and Pine Centre Road (Prince George). Last update: November 20th, 2026 at 3:45pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:45 p.m. PDT
MinorTiming unconfirmed

Road condition

Slippery sections between Pine Centre Road and Mitchell Road (22 miles north of Prince George). Last update: November 20th, 2026 at 3:44pm PCT. Next update: November 21st, 2026 at 5:00am PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 3:44 p.m. PDT
MinorTiming unconfirmed

Road condition

Limited visibility with fog between Thorley Road (Hixon) and Chamulak Road (22 miles south of Pineview). Last update: November 20th, 2026 at 8:02am PCT. Next update: November 20th, 2026 at 4:00pm PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 8:02 a.m. PDT
MinorTiming unconfirmed

Road condition

Limited visibility with fog between Olson Road and Thorley Road (Hixon). Last update: November 20th, 2026 at 8:02am PCT. Next update: November 20th, 2026 at 4:00pm PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 8:02 a.m. PDT
MinorTiming unconfirmed

Road condition

Slippery sections between Powder King Road (near Pine Pass Summit) and Old Hasler Road (24 miles south of Chetwynd). Last update: November 20th, 2026 at 6:52am PCT. Next update: November 20th, 2026 at 4:00pm PCT.

Highway 97 · Highway 97

Affected section reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to onward (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 6:52 a.m. PDT
MinorTiming unconfirmed

Construction

Construction work from Highway 97, Callan Rd to N Beach Rd. Starting 7:00 AM PDT on Tuesday September 8, 2026. From 6:30 AM to 5:00 PM PDT, Monday to Saturday. Speed Limit restriction: 70. Last update: November 20th, 2026 at 2:35pm PCT. Expect gravel trucks entering and exiting work zone throughout the week. Follow posted traffic signs, use caution, avoid following construction vehicles into turning lanes. Speed limit reduced from 70km/h to 50km/h during active hauling hours.

Highway 97 · Highway 97

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Sep 8, 2026 to onward (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 20, 2026, 2:35 p.m. PDT
MinorTiming unconfirmed

Construction

Utility work from Highway 97, At Barlow Avenue to At Shepherd Avenue. Starting 10:00 AM PCT on Friday November 20, 2026 until 10:00 PM PCT on Friday November 20, 2026. Shoulder closed. Left turn lane closed. Watch for traffic control. Last update: November 19th, 2026 at 11:25am PCT. One lane maintained in each direction.

Highway 97 · Front Street

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 20, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 19, 2026, 11:25 a.m. PDT
MinorTiming unconfirmed

Construction

Utility work at Highway 97, 2km North of 70 Mile Frontage Road. Starting 8:00 AM PCT on Monday November 16, 2026 until 4:00 PM PCT on Wednesday December 30, 2026. From 8:00 AM to 4:00 PM PCT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: November 19th, 2026 at 9:21am PCT.

Highway 97 · Highway 97

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 16, 2026 to Dec 30, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 19, 2026, 9:21 a.m. PDT
MinorTiming unconfirmed

Construction

Road maintenance from Highway 97. Starting 8:00 AM PCT on Wednesday November 18, 2026 until 5:00 PM PCT on Friday November 20, 2026. From 8:00 AM to 5:00 PM PCT, Wednesday to Friday. Southbound lane closure. Watch for traffic control. Last update: November 18th, 2026 at 8:21am PCT. Road maintenance in progress. Use caution when passing crew and equipment working.

Highway 97 · Highway 97

Lane impact reported · Reported direction: N

Schedule: Source dates: Nov 18, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 18, 2026, 8:21 a.m. PDT
MinorTiming unconfirmed

Construction

Road construction at Highway 97, 782m North of Ped Multiplate Tunnel. Starting 8:00 AM PCT on Tuesday November 10, 2026 until 5:00 PM PCT on Monday November 30, 2026. From 8:00 AM to 5:00 PM PCT, Thursday to Saturday. Shoulder closed. Last update: November 17th, 2026 at 4:37pm PCT. Periodic lane closure in effect. Watch for industrial traffic.

Highway 97 · Hart Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 10, 2026 to Dec 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 17, 2026, 4:37 p.m. PDT
MinorTiming unconfirmed

Construction

Bridge maintenance from Highway 97, At 255 Road to 259 Rd. Starting 7:00 AM MST on Tuesday November 17, 2026 until 7:00 PM MST on Monday November 30, 2026. From 7:00 AM to 7:00 PM MST, every day. Single lane alternating traffic. Last update: November 17th, 2026 at 3:55pm MST. Full closure Wednesday, November 25th. Detour via: NB- 255 Rd to Airport Rd, Swanson Lumber Rd to Hwy 97. SB- Swanson Lumber Rd to Airport Rd, 255 Rd to Hwy 97.

Highway 97 · Highway 97 S

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 17, 2026 to Dec 1, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 17, 2026, 3:55 p.m. PDT
MinorTiming unconfirmed

Construction

Tree pruning from Highway 97, Chamulak Road / Plett Road to Williams Road E / W. Starting 7:00 AM PCT on Monday November 16, 2026 until 6:00 PM PCT on Friday November 20, 2026. Shoulder closed. Northbound lane closure. Last update: November 15th, 2026 at 6:59am PCT.

Highway 97 · Cariboo Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 16, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 15, 2026, 6:59 a.m. PDT
MinorTiming unconfirmed

Construction

Utility work at Highway 97, 822m South of Tudyah Lake Park Access. Starting 7:00 AM PCT on Tuesday November 10, 2026 until 6:00 PM PCT on Friday November 20, 2026. From 7:00 AM to 6:00 PM PCT, weekdays. Reduced to one lane. Last update: November 13th, 2026 at 10:06am PCT.

Highway 97 · Hart Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 10, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 13, 2026, 10:06 a.m. PDT
MinorTiming unconfirmed

Construction

Construction work at Highway 97, 34km North of Quesnel and Olsen Rd intersection. Starting 8:00 AM PDT on Monday August 17, 2026 until 4:00 PM PCT on Monday November 30, 2026. From 7:00 AM to 7:00 PM PDT, Monday to Saturday. Last update: November 10th, 2026 at 3:31pm PCT. Intersection improvements. Intermittent lane closures in both directions. Speed reduction in place. Watch for traffic control.

Highway 97 · Highway 97

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Aug 17, 2026 to Nov 30, 2026 (exact timing unconfirmed); work periods unconfirmed · Work periods are unconfirmed

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 10, 2026, 3:31 p.m. PDT
MinorTiming unconfirmed

Construction

Construction work at Highway 97, 1km South of Summit Lake Road. Starting 7:00 AM PCT on Monday November 16, 2026 until 5:00 PM PCT on Friday November 20, 2026. Single lane alternating traffic. Watch for traffic control. Last update: November 9th, 2026 at 2:05pm PCT.

Highway 97 · Hart Highway

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Nov 16, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 9, 2026, 2:05 p.m. PDT
MinorTiming unconfirmed

Construction

Paving operations from Highway 97, Mt Solitude to Powder King Rd. Starting 7:00 AM MST on Monday August 17, 2026 until 7:00 PM MST on Friday November 20, 2026. From 7:00 AM to 7:00 PM MST, Monday to Saturday. Single lane alternating traffic. Last update: November 9th, 2026 at 9:48am MST.

Highway 97 · Highway 97 S

Lane impact reported · Reported direction: BOTH

Schedule: Source dates: Aug 17, 2026 to Nov 21, 2026 (exact timing unconfirmed) · Exact local time was not supplied

DriveBC reports this event, but its current timing cannot be confirmed. It may still affect travel; check the official source before proceeding.

Official update: Nov 9, 2026, 9:48 a.m. PDT

Data status

Source: DriveBC

Latest available data
Last updated

Coverage: The road status comes from information published by the transportation authority. Missing, delayed or incomplete information is not treated as an open road.

View official source →
Update details
FireRadar checked
Page prepared
Normal update timing
5 minutes

Source and FireRadar check times may differ.

Environment Canada

Weather along the corridor

Current
Alerts
0
Temperature
4°C
Wind
6 km/h
Gust
29 km/h

No active Environment Canada weather alert currently matches this corridor. Conditions can still vary locally.

Nearest weather location: Penticton · observed Nov 20, 2026, 4:00 p.m. PDT.
Tonight
Partly cloudy. Wind north 20 km/h. Low minus 4. Wind chill minus 9 overnight.
Saturday
Sunny. Wind north 20 km/h. High plus 2. Wind chill minus 10 in the morning. UV index 1 or low.
Saturday night
Increasing cloudiness. 60 percent chance of flurries late in the evening and overnight. Wind up to 15 km/h. Low minus 1. Wind chill minus 5 overnight.
Sunday
Periods of snow. High zero.

Winter driving

FireRadar shows road records, Environment Canada weather and cameras together. It cannot determine traction, stopping distance, chain requirements or whether travel is safe unless the transportation authority publishes that information.

View latest camera images →

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.