Current official incidents and travel disruptions affecting this highway scope, including source update times and affected-road context where supplied.
1 active matching official record. A missing event is never interpreted as a route-wide open or safe condition.
Retrieved: Aug 19, 2026, 10:39 p.m. UTC
Active incidents and disruptions
CONSTRUCTION · MAJOR
CONSTRUCTION
[Truncated] Highway 5 (Coquihalla North), in both directions. Bridge construction between Exit 286: Merritt - 97C and Exit 290: Merritt for 4.1 km (Merritt). Until Sat Oct 31. 1 lane open in each direction at all times. Counterflow lane in effect 10am-6pm northbound from Fri-Sat, southbound on Sun. Northbound wide loads restricted to 3.8m while counterflow in effect. Wide loads otherwise restricted to 5m. Speed to 50km/h. Watch for signage and traffic control. Next update time Fri Aug 21 at 12:0
FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.