FireRadar Highways · live utility page

Highway 1 — British Columbia · Vancouver → Hope incidents and travel disruptions

Current official incidents and travel disruptions affecting this highway scope, including source update times and affected-road context where supplied.

Official transportation source
CLOSURE REPORTEDCURRENT

12 active matching official records. A missing event is never interpreted as a route-wide open or safe condition.

Retrieved: Aug 20, 2026, 6:51 a.m. UTC

Active incidents and disruptions

INCIDENT · MAJOR

INCIDENT

[Truncated] Highway 1 (TransCanada Highway), in both directions. There is a wildfire between Toll Rd and Aspen Rd for 38.8 km (Yale to 28 km south of Jackass Mountain Summit). Road closed. Highway 1 closed due to wildfire burning north of Hells Gate in close proximity to the highway. Southbound closure south of Boston Bar. Northbound closure starts in Yale. Watch for crews and signage. Use Highway 3 or Highway 5 as alternate route. Next update time Thu Aug 20 at 4:00 PM PDT. Last updated Wed Aug

Official update: Aug 20, 2026, 3:19 a.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Paving operations from Highway 1, In West Vancouver and 112m West of Nelson Creek Bridge to In West Vancouver and 382m East of Exit 13 to Taylor Way. Starting Wed Aug 19 until Thu Aug 20. Right lane closed. Last update: August 19th, 2026 at 9:27am PDT.

Official update: Aug 19, 2026, 4:27 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Highway 1 (TransCanada Highway), in both directions. Road sweeping between Horseshoe Bay Ferry Terminal and Exit 27: E 1st Ave for 26.5 km (Vancouver to West Vancouver). Until Fri Aug 21 at 7:00 PM PDT. Lane closures in both directions in effect. Watch for slow moving vehicles. Last updated Fri Aug 14 at 1:35 PM PDT. (DBC-93967)

Official update: Aug 15, 2026, 2:00 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Electrical maintenance from Highway 1, In Vancouver and Cassiar Tunnel to In Vancouver. Starting Sun Aug 23 until Tue Sep 1. From 9:00 PM to 4:00 AM PDT the next day, Monday to Thursday and Sunday. Left lane closed. Watch for traffic control. Last update: August 14th, 2026 at 4:54pm PDT.

Official update: Aug 14, 2026, 11:54 p.m. UTC
CONSTRUCTION · MAJOR

CONSTRUCTION

Construction work at Highway 1, In Abbotsford and At Mt Lehman Underpass. Starting Mon Aug 17 until Sat Aug 29. From 9:00 PM to 5:30 AM PDT the next day, Monday to Thursday and Sunday. From 9:00 PM to 7:00 AM PDT the next day, Friday and Saturday. Lane closures in both directions. Eastbound lane closure. Detour in effect. Last update: August 14th, 2026 at 4:22pm PDT. Eastbound traffic will use one westbound lane.

Official update: Aug 14, 2026, 11:22 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Highway 1 (TransCanada Highway), in both directions. Bridge maintenance at Port Mann Bridge (Surrey). Until Fri Aug 21. From 7:00 PM to 6:00 AM PDT on Sunday, Monday, Tuesday, Wednesday and Thursday. HOV lane closed. Watch for traffic control. Watch for traffic control and crews on scene. Last updated Mon Jul 20 at 11:15 AM PDT. (DBC-93701)

Official update: Aug 9, 2026, 7:00 a.m. UTC
CONSTRUCTION · MAJOR

CONSTRUCTION

Construction work. Starting Wed May 6 until Wed Nov 25. Watch for traffic pattern change and speed reduction.

Official update: Jul 17, 2026, 6:20 a.m. UTC
CONSTRUCTION · MAJOR

CONSTRUCTION

Construction work. Starting Fri Jun 5 until Sat Oct 31. Watch for traffic control. Lane shift in effect. Traffic will be detoured north of the highway to get by the work site. This will remain in effect 24/7.

Official update: Jul 17, 2026, 6:20 a.m. UTC
CONSTRUCTION · MAJOR

CONSTRUCTION

Road construction. Starting Fri Jul 10 until Sat Oct 31. Closed. Traffic will be shifted to the north of the median around 256th St and and will cross over around Lefeuvre Rd. Existing eastbound lanes will be closed. This will remain in place 24/7.

Official update: Jul 17, 2026, 6:20 a.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Bridge construction. Starting Fri Jul 10 until Mon Aug 31. Watch for traffic control. Expect delays. Traffic plan implemented 24/7. Lane shift impacting both directions. Two lanes will be maintained each way.

Official update: Jul 2, 2026, 9:34 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Construction work. Starting Thu Jul 2 until Mon Aug 31. From 6:00 AM to 6:00 PM PST on Monday, Tuesday, Wednesday, Thursday, Friday, and Saturday. Shoulder closed.

Official update: Jul 2, 2026, 4:29 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Road construction. Starting Wed Jun 24 until Wed Sep 30. From 7:00 AM to 9:00 PM PST on Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, and Sunday. Shoulder closed.

Official update: Jun 26, 2026, 4:03 p.m. UTC

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.