FireRadar Highways · live utility page

Highway 1 — British Columbia · Hope → Kamloops closures and restrictions

Current official closure and restriction records for this highway scope, with direct authority verification and explicit unknown-state handling.

Official transportation source
INCIDENTS REPORTEDCURRENT

11 active matching official records. A missing event is never interpreted as a route-wide open or safe condition.

Retrieved: Aug 20, 2026, 6:49 a.m. UTC

Closure and restriction records

4 matching closure records and 1 separate restriction record are currently visible from the integrated authority feed.

INCIDENT · MAJOR

INCIDENT

[Truncated] Highway 1 (TransCanada Highway), in both directions. There is a wildfire between Toll Rd and Aspen Rd for 38.8 km (Yale to 28 km south of Jackass Mountain Summit). Road closed. Highway 1 closed due to wildfire burning north of Hells Gate in close proximity to the highway. Southbound closure south of Boston Bar. Northbound closure starts in Yale. Watch for crews and signage. Use Highway 3 or Highway 5 as alternate route. Next update time Thu Aug 20 at 4:00 PM PDT. Last updated Wed Aug

Official update: Aug 20, 2026, 3:19 a.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Highway 1 (TransCanada Highway), in both directions. Utility work between Campbell Hill Dr and Sage and Sands Dr for 1.4 km (Cache Creek). Until Fri Aug 21. From 8:00 AM to 4:00 PM PDT on Tuesday, Wednesday, Thursday and Friday. Right lane is closed in both directions. Watch for traffic control. Last updated Mon Aug 17 at 10:29 AM PDT. (DBC-93978)

Official update: Aug 18, 2026, 7:00 a.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Highway 1 (TransCanada Highway), eastbound. Construction work between West Kamloops and Copperhead Dr (Kamloops). Until Sat Oct 31. Motorists are advised to pull as far ahead as possible and do brake checks in the right lane within the brake check. Washrooms closed, use Hwy 5 - Inks Lake Brake Check. Last updated Thu Jul 2 at 3:37 PM PDT. (DBC-93395)

Official update: Jul 2, 2026, 10:37 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Construction work. Starting Thu Jul 2 until Mon Aug 31. From 6:00 AM to 6:00 PM PST on Monday, Tuesday, Wednesday, Thursday, Friday, and Saturday. Shoulder closed.

Official update: Jul 2, 2026, 4:29 p.m. UTC
CONSTRUCTION · MINOR

CONSTRUCTION

Highway 1 (TransCanada Highway), in both directions. Construction work between Nicomen River Rd and Junction Hwy 8 (13 km west of Spences Bridge). Until Wed Jun 30, 2027. Single lane alternating traffic in effect at Sackum Overhead 24/7 until Dec 2026. Speed reduced to 50km/h. Watch for signage and personnel. Expect minor delays. Please obey signage and signals. Next update time Mon Aug 31 at 10:00 AM PDT. Last updated Sun Jul 19 at 9:16 AM PDT. (DBC-86190)

Official update: Jul 19, 2026, 4:16 p.m. UTC

FireRadar is an informational service. Transportation authorities remain authoritative for road status, restrictions and closures; emergency and wildfire authorities remain authoritative for evacuation and public-safety instructions.